Research/Jurisdiction

Mining and mineral exploration in the Athabasca Basin

Athabasca Basin uranium in 2026: Cigar Lake, McArthur River, Rook I, Phoenix and Paladin's Atlas find, plus Saskatchewan claim fees and free data.

Updated November 20266 min read

Explorers search the Athabasca Basin in northern Saskatchewan for high-grade uranium. Cigar Lake's reserves average 16.33% U3O8 and McArthur River's average 6.48% U3O8, and their operator Cameco calls Cigar Lake the world's highest-grade uranium mine and McArthur River the world's largest high-grade one (Cameco 2025 AIF). NexGen is building its Rook I mine after the Canadian Nuclear Safety Commission licensed construction in March 2026 (CNSC), Denison started full-scale construction of its Phoenix in-situ recovery mine in July 2026 (Denison), and in June 2026 Paladin reported 8.0 m at 1.75% U3O8 from its new Atlas discovery at Patterson Lake South (Paladin). Saskatchewan ranked 3rd of 68 jurisdictions on the Fraser Institute's 2025 investment attractiveness index, up from 7th (Fraser Institute, BNN Bloomberg), and the province expects C$483 million of exploration spending in 2026, up 23% (Government of Saskatchewan).

Uranium deposits

Athabasca uranium deposits lie at or near the unconformity between sandstone of the Athabasca Group and older metamorphic basement, and Cameco says deposits of this type probably formed through a redox reaction where oxygenated fluids met reducing fluids (Cameco 2025 AIF).

At Cigar Lake the unconformity separates late Paleoproterozoic to Mesoproterozoic Athabasca sandstone from middle Paleoproterozoic gneiss and plutonic rocks of the Wollaston Group. The orebody is a flat lens about 1,950 m long, 25 to 100 m wide and up to 15.7 m thick, and hydrothermal clay alteration overlies it (Cameco 2025 AIF).

At McArthur River the P2 reverse fault thrust a wedge of basement 60 to 80 m up into the sandstone, and most of the ore is high-grade mineralization on the unconformity next to that fault, in both sandstone and basement (Cameco 2025 AIF). At both mines the sandstone over the ore holds large volumes of water at high pressure, and Cameco mines Cigar Lake with a jet boring system and McArthur River by blasthole stoping and raiseboring (Cameco 2025 AIF).

Near Patterson Lake in the Athabasca Basin region, Paladin targets unconformity-associated uranium at the base of the basin or in the metamorphic basement below it. The Saloon Trend is a structural zone up to 1 km wide, 3.5 km south of the shear zones hosting the Triple R deposit. Paladin found Atlas there by drilling an anomaly from a 2025 ground geophysical survey, and the mineralization starts about 160 m downhole in basement rock (Paladin).

Mines and projects

Project Owner Stage in 2026 Figures
McArthur River and Key Lake Cameco 69.805% and operator, Orano 30.195% (Key Lake mill: Cameco 83.333%, Orano 16.667%) Producing, licensed through October 2043 Reserves of 241.9 Mlb at 6.48% U3O8 (Cameco's share), 15.1 Mlb produced in 2025 (100% basis)
Cigar Lake Cameco 54.547% and operator, Orano 40.453%, TEPCO Resources 5% Producing, licensed through June 2031 Reserves of 94.1 Mlb at 16.33% U3O8 (Cameco's share), 19.1 Mlb produced in 2025 (100% basis)
Rook I, Arrow deposit NexGen Energy Construction licence from 5 March 2026, 4-year build Measured resource of 209.6 Mlb at 4.35% U3O8, permitted to produce up to 30 Mlb a year
Phoenix, Wheeler River Denison Mines 90% and operator, JCU (Canada) Exploration 10% Full-scale construction from July 2026 In-situ recovery mine, Phase 1 freeze wall under way
Patterson Lake South, Triple R and Atlas Paladin Energy Resource and exploration drilling Atlas hole PLS26-718 intersected 14.5 m at 1.70% U3O8, and the zone is open along strike and at depth

Cameco's 2026 outlook is 14 to 16.5 million pounds from McArthur River and Key Lake and 17.5 to 18 million pounds from Cigar Lake, both on a 100% basis, and Orano's McClean Lake mill processes the Cigar Lake ore (Cameco 2025 AIF). NexGen's licence lets it prepare the site and build Rook I, about 155 km north of La Loche, until 31 March 2036, and running the mine needs a separate CNSC licence after a future hearing (CNSC).

Saskatchewan mining

Saskatchewan's mineral sales were over C$12.8 billion in 2025, with C$9.3 billion of potash and a record C$3.2 billion of uranium, and the province led Canada with C$6.7 billion of mineral resource development spending, 25% of the national total (Government of Saskatchewan). The province expects copper, zinc and lithium to reach commercial production in Saskatchewan for the first time by the end of 2026, from Eldorado Gold's McIlvenna Bay copper-zinc-gold-silver project and Prairie Lithium, and Trident Resources is running a 30,000 to 40,000 m drill program in the La Ronge Gold Belt (Government of Saskatchewan).

Mineral claims

Saskatchewan replaced ground staking with an online registry, the Mineral Administration Registry Saskatchewan (MARS), in December 2012, and you open a MARS account and register your client information before you apply for a disposition (Government of Saskatchewan). A claim gives you the exclusive right to explore for Crown minerals on its land and the right to convert it to a lease, and you give the minister notice before any bulk sample (Mineral Tenure Registry Regulations).

The Mineral Tenure Registry Regulations, consolidated with amendments to 2024, set the size, fees, term and work for each title (Mineral Tenure Registry Regulations).

Title Size Registration fee Term Work each year
Claim Up to 6,000 ha, no longer than six times its width C$0.60 a hectare, minimum C$300 One year, continued year to year Nil in year 1, then C$15 a hectare (minimum C$240) to year 10 and C$25 a hectare (minimum C$400) from year 11
Permit 10,000 to 50,000 ha, on land the minister makes available for permits by notice C$0.30 a hectare, minimum C$3,000, plus a C$30,000 performance deposit Two years C$5.25 a hectare over the term
Lease Converted from a claim Nil 10 years, renewable for 10 C$25 a hectare (minimum C$400) in years 1 to 10, double that in years 11 to 20 and triple from year 21, plus a C$10 a hectare rental (minimum C$1,600) in years the lease produces or has expenditure relief

The Targeted Mineral Exploration Incentive pays 25% of drilling costs, including logging and downhole surveys, and of ground and borehole geophysical surveys, up to C$50,000 a year for uranium and three times that for other hard-rock projects, and drilling on mining leases doesn't qualify (Government of Saskatchewan).

Free data

The Saskatchewan Geological Survey publishes the Saskatchewan Mining and Petroleum GeoAtlas, GeoHub datasets, the Saskatchewan Mineral Deposit Index (SMDI) of known showings and the Saskatchewan Mineral Assessment Database (SMAD) of non-confidential assessment files (Saskatchewan Geological Survey). SMAD adds files when their confidentiality period ends, downloadable as ZIP files (SMAD). For portals in other provinces and countries, see free mineral exploration data sources.

GeoTheories in the Athabasca Basin

In GeoTheories, agents build out your thesis from the deposit model and then walk it through every layer. For every Saskatchewan thesis, agents read SGS bedrock geology at 1:250,000 with its faults, about 6,200 mineral occurrences, about 7,800 active and lapsed dispositions, about 33,000 drill holes, about 28,700 geochem samples and about 11,500 SMAD assessment reports.

Build a thesis such as basement-hosted uranium on a structural trend parallel to the Patterson Lake corridor, and agents check it against the faults, the historic holes and their end-of-hole depths, the assessment reports and the open ground, so you know where earlier operators stopped drilling before you apply for a claim in MARS. Switch on ground alerts and you get an email when someone registers a claim in your thesis area or a disposition there transfers, lapses or is within 30 days of expiry.

Solo is $299 a month or $2,499 a year, and Team is $699 a month or $5,849 a year for up to 5 people, through self-serve checkout.

Questions

What is the highest-grade uranium mine in the world?

Cigar Lake in the Athabasca Basin is the world's highest-grade uranium mine, according to its operator Cameco, and its proven and probable reserves of 94.1 million pounds (Cameco's share) average 16.33% U3O8 (Cameco 2025 AIF).

Who owns McArthur River?

Cameco owns 69.805% and operates the mine, and Orano owns 30.195%. The same two companies own the Key Lake mill (Cameco 83.333%, Orano 16.667%) (Cameco 2025 AIF).

Is NexGen's Rook I approved?

Yes, the CNSC issued NexGen a licence to prepare the site and construct Rook I on 5 March 2026, valid until 31 March 2036, and operating the mine needs a separate licence after a future hearing (CNSC).

How do you stake a mineral claim in Saskatchewan?

You apply online in MARS with a list of mineral disposition parcels and a registration fee of C$0.60 a hectare (minimum C$300), for up to 6,000 hectares, and the claim needs no exploration spending in its first year (Mineral Tenure Registry Regulations).