Mining and mineral exploration in Argentina

Compare Argentina's 2026 projects and rules: Vicuña and Los Azules copper in San Juan, lithium brine in Salta, Catamarca and Jujuy, RIGI and the cateo permit.

Updated November 20268 min read

Explorers search Argentina for porphyry copper in San Juan and lithium brine in Salta, Catamarca and Jujuy, and the largest projects now apply under RIGI, the large-investment regime, for a 25% income tax rate and 30 years of tax, customs and currency stability (Law 27,742). In June 2026 Lundin Mining and BHP's Vicuña project became the first copper project approved for RIGI's long-term export tier, with 40 years of benefits, and the partners aim to decide on Stage 1 before the end of 2026 (Lundin Mining). Argentina accepted McEwen Copper's Los Azules into RIGI in September 2025 with a US$2.67 billion plan (McEwen release), and Rio Tinto commissioned Sal de Vida in Catamarca in February 2026 and is building the full-scale Rincon plant in Salta for first production in 2028, while the 3,000 t a year starter plant ramps up (Rio Tinto Q1 2026).

Geology and deposit types

The Vicuña district lies on the Chile border in San Juan, between the Maricunga and El Indio belts, and it has four known copper-gold deposits (Lundin Mining). Josemaria is a porphyry copper-gold system planned as an open pit with flotation, and Filo del Sol, 10 km away, is a high-sulphidation epithermal copper-gold-silver deposit associated with a large porphyry system (Lundin Mining). Filo del Sol's upper oxidized zone is at the prefeasibility stage, and the deeper sulphides remain a target (Lundin Mining).

Los Azules, in the Calingasta district of San Juan on the Chile border, has Proven and Probable Reserves of 1.02 billion t at 0.45% Cu, plus 0.97 billion t Measured and Indicated at 0.26% Cu and 4.24 billion t Inferred at 0.21% Cu (McEwen 8-K). McEwen Copper plans an open pit and heap leach, with solvent extraction-electrowinning (SX/EW) to make copper cathode on site (McEwen 8-K).

The lithium comes from brine pumped from salars. Rincon pumps brine from the Salar del Rincon in Salta and uses direct lithium extraction (DLE) (Rio Tinto), and Cauchari-Olaroz in Jujuy pumps brine from the Cauchari and Olaroz salars (Lithium Argentina). Under the Mining Code lithium is a first-category mineral, so it belongs to the state and you need a concession to mine it (Mining Code, arts. 2 and 3).

Mines and projects

Project Province Owner Metals Status in 2026 Figures
Vicuña (Josemaria, Filo del Sol) San Juan Lundin Mining 50%, BHP 50% Copper, gold, silver RIGI long-term export tier approved, Stage 1 investment decision targeted for 2026 Stage 1 initial capital $7.1 billion
Los Azules San Juan McEwen Copper Copper RIGI approved September 2025, feasibility study October 2025 204,800 t a year of cathode in years 1 to 5, $3.17 billion initial capital, 21-year life
Rincon Salta Rio Tinto Lithium Starter plant ramping up, full-scale plant building for first production in 2028 60,000 t a year of battery-grade lithium carbonate
Fénix 1B Catamarca Rio Tinto Lithium Mechanically complete, first production in H2 2026 10,000 t a year lithium carbonate equivalent (LCE)
Sal de Vida Catamarca Rio Tinto Lithium Commissioned February 2026, commercial production in H2 2026 15,000 t a year LCE
Cauchari-Olaroz Jujuy Ganfeng 46.7%, Lithium Argentina 44.8%, JEMSE 8.5% Lithium Commissioned in 2024 40,000 t a year nameplate

Stage 1 at Vicuña covers the Josemaria deposit and a sulphide mill, and the 2026 integrated study estimates the project's taxes and royalties to Argentina at about $965 million a year (Lundin Mining). At Los Azules, McEwen Inc. owns 46.4% of McEwen Copper, Stellantis 18.3% and Nuton, a Rio Tinto venture, 17.2%, and San Juan's Ministry of Mines approved the environmental impact declaration for construction and operation in December 2024 (McEwen 8-K, McEwen release). Rio Tinto approved $2.5 billion for Rincon in December 2024 and secured a $1.175 billion financing package for it in March 2026 (Rio Tinto, Rio Tinto Q1 2026). Lithium Argentina calls Cauchari-Olaroz the country's largest lithium brine operation (Lithium Argentina).

RIGI

Law 27,742 of July 2024 set up RIGI (Régimen de Incentivo para Grandes Inversiones) for mining, energy, oil and gas, infrastructure and other sectors (Law 27,742, arts. 164 to 228). A single-project vehicle (VPU) holds each project and invests at least US$200 million in qualifying assets, and the executive can set higher minimums by sector, up to $900 million (art. 173). The vehicle pays 25% income tax (art. 183) and keeps the tax, customs and currency rules in force on its admission date for 30 years (art. 201). The long-term strategic export tier (PEELP) extends the benefits to 40 years and speeds up revenue repatriation and export duty exemptions (Lundin Mining).

The law opened applications for two years from 8 July 2024, and Decree 105/2026 extended the application period by one year from 8 July 2026 (Decree 105/2026).

Mining titles

Mines belong to the nation or to the province they lie in (Mining Code, art. 7), so you apply to the province's mining authority under the national Mining Code. The Secretaría de Minería lists the provincial authorities, among them San Juan's and Catamarca's ministries of mining and Salta's Ministry of Energy and Natural Resources (SIACAM).

Title Size Term and conditions
Exploration permit (cateo) Units of 500 ha, up to 20 units (10,000 ha) a permit 150 days for one unit plus 50 days for each extra unit. At day 300 you release half the area above 4 units, and at day 700 half of what remains
Mine concession (mina) Pertenencias of 300 by 200 m, or 100 ha for disseminated first-category deposits and for lithium and borates A yearly canon (fee) per pertenencia, ten times the ordinary rate for the 100 ha kinds, and an investment plan

A cateo application gives the corner coordinates (with sides oriented north-south and east-west), a minimum work program and the planned investment, and you pay the exploration canon with it (Mining Code, arts. 25, 29 and 30). The permit gives you the exclusive right to concessions inside its area, and one person can hold up to 20 permits or 400 units in a province (arts. 25 and 29). The code set the exploration canon at ARS 9,680 a unit in 2022 (art. 215), and the Secretaría de Minería updates the yearly canon per pertenencia for inflation (art. 213).

You register a discovery as a manifestación de descubrimiento with a sample, and the discoverer pays no canon on the concession for three years (arts. 46 and 224). Within a year of the survey request the concessionaire files an investment plan, and the investment must reach at least 300 times the annual canon within five years (art. 217). A concession lapses when a canon payment is two months overdue, and the holder then has 45 days to redeem it by paying the debt plus a 100% surcharge (arts. 216 and 219).

Free data

SEGEMAR, the national geological survey, gives free access to the SIGAM map viewer, its digital repository and its core library, and it keeps a catalogue of geophysical data (SEGEMAR). The SIGAM viewer holds 1:250,000 geology, metallic and industrial deposits, multielement stream and soil geochemistry and airborne magnetics and radiometrics, under CC BY 4.0 (SIGAM catalogue). The Secretaría de Minería links the provincial mining cadastres of Catamarca, Jujuy, Mendoza, Neuquén, Río Negro, Salta, San Juan and Santa Cruz (SIACAM). For portals in Chile and other countries, see free mineral exploration data sources.

GeoTheories in Argentina

In GeoTheories, agents build out your thesis from the deposit model and then walk it through every layer. In Argentina the layers are SEGEMAR 1:250,000 geology and faults, SEGEMAR's airborne magnetics (reduced to the pole) and potassium, thorium and uranium radiometrics, about 8,300 deposits, occurrences and mine and quarry sites, about 38,000 stream and soil geochemistry samples and about 13,700 mining titles in San Juan, Salta, Río Negro, Jujuy and Mendoza.

Build a thesis such as a porphyry copper centre between the Maricunga and El Indio belts on open ground in San Juan, and agents check it against the geology, the magnetics, the stream geochemistry and the title map, and they run the same check on the Chilean side of the border. Each project page names the owner, royalty holder and earn-in partner, and the report builder drafts cited NI 43-101 Items 4 to 10 and 23 for the QP to sign (NI 43-101 drafting). Switch on ground alerts and you get an email when someone applies for ground in your thesis area, or a title in it transfers, lapses or is 30 days from expiry.

Solo is $299 a month or $2,499 a year, and Team is $699 a month or $5,849 a year for up to 5 people, through self-serve checkout.

FAQ

What is RIGI in Argentina?

RIGI is Argentina's large-investment regime under Law 27,742, and a project investing at least US$200 million gets a 25% income tax rate and 30 years of tax, customs and currency stability (Law 27,742). Applications are open until 8 July 2027 after Decree 105/2026 added a year (Decree 105/2026).

Where is lithium mined in Argentina?

Producers pump lithium brine from salars in Jujuy, Catamarca and Salta. Cauchari-Olaroz in Jujuy was commissioned in 2024 (Lithium Argentina). Rio Tinto already produces at Fénix in Catamarca and at Rincon's starter plant in Salta. Its Fénix 1B expansion and Sal de Vida in Catamarca start production in the second half of 2026, and the full-scale Rincon plant follows in 2028 (Rio Tinto Q1 2026).

How do you get an exploration permit in Argentina?

You apply to the province's mining authority for a cateo of up to 20 units of 500 ha, with the coordinates, a work program and the exploration canon, and the permit lasts 150 days for one unit plus 50 days for each extra unit (Mining Code, arts. 25, 29 and 30).

What are the biggest copper projects in Argentina?

Two of the largest are Vicuña (Josemaria and Filo del Sol), owned 50-50 by Lundin Mining and BHP, with a Stage 1 initial capital of $7.1 billion (Lundin Mining), and McEwen Copper's Los Azules, with 1.02 billion t of reserves at 0.45% Cu (McEwen 8-K). Both are in San Juan.