Form 43-101F1 has 27 items. GeoTheories drafts Items 4 to 10 and 23 ready for QP review, and Leapfrog, Micromine or Datamine estimate the resource.

Updated November 202610 min read

An NI 43-101 technical report follows the 27 items of Form 43-101F1, and GeoTheories writes cited first drafts of Items 4 to 10 and 23, S-K 1300 sections 3 to 7 and 20 and JORC Table 1 Section 2, and the qualified person (QP) reviews and signs them. For the company's own work, a drill hole database such as acQuire GIM Suite, DataShed or MX Deposit holds the exploration, drilling, sampling and QA/QC data for Items 9 to 12, Leapfrog Geo with Leapfrog Edge, Micromine Origin or Datamine Studio RM models and estimates the resource for Item 14, and you draw the report's location, geology and drilling maps in a GIS such as QGIS or ArcGIS Pro.

Form 43-101F1 items

Form 43-101F1 Technical Report sets the headings and content of every NI 43-101 technical report, and the QP must use the headings of Items 1 to 14 and 23 to 27 in every report (Form 43-101F1, instruction 4). A report on an advanced property also needs Items 15 to 22, and NI 43-101 defines it as a property with mineral reserves, or with mineral resources whose potential economic viability a preliminary economic assessment (PEA), pre-feasibility study or feasibility study supports (NI 43-101, section 1.1). The 2011 form is the current version on the BCSC's NI 43-101 page (checked November 2026).

Item Heading Source
1 Summary The QP, from the whole report
2 Introduction The issuer, the terms of reference and each QP's personal inspection
3 Reliance on Other Experts Other experts' legal, political, environmental or tax opinions
4 Property Description and Location The mining titles registry, plus the issuer's agreements, title and permits
5 Accessibility, Climate, Local Resources, Infrastructure and Physiography Public topographic, climate and infrastructure records
6 History Assessment reports, earlier technical reports, filings and production records
7 Geological Setting and Mineralization Government geological maps and earlier reports, plus the issuer's mapping
8 Deposit Types Published deposit models
9 Exploration The issuer's surveys and sampling
10 Drilling The issuer's drilling, and earlier operators' results
11 Sample Preparation, Analyses and Security The issuer's sampling, laboratory and QA/QC procedures
12 Data Verification The QP's own checks
13 Mineral Processing and Metallurgical Testing Metallurgical test work
14 Mineral Resource Estimates The QP's resource model and estimate
15 Mineral Reserve Estimates The QP's reserve estimate
16 Mining Methods Mine design and geotechnical studies
17 Recovery Methods Process test work and plant design
18 Project Infrastructure Engineering studies
19 Market Studies and Contracts The issuer's market studies and contracts
20 Environmental Studies, Permitting and Social or Community Impact Environmental studies, permits and community agreements
21 Capital and Operating Costs Cost estimates
22 Economic Analysis Cash flow model, NPV, IRR and payback
23 Adjacent Properties The adjacent owner's public disclosure
24 Other Relevant Data and Information The QP
25 Interpretation and Conclusions The QP
26 Recommendations The QP, with a cost breakdown for each phase
27 References Every reference in the report

Public-record items

Item 4 Property Description and Location requires the property's area and location, the type of tenure and each title's name or number, the issuer's title and interest, the obligations to keep the property and the expiry dates, and to the extent known, royalties, back-in rights, payments, environmental liabilities, permits and other risks. The mining titles registry holds the tenure type, title numbers, area, holder and expiry dates, and the issuer supplies its agreements, title opinion and permits.

Item 5 Accessibility, Climate, Local Resources, Infrastructure and Physiography requires the topography, elevation and vegetation, the means of access, the nearest population centre and transport, the climate and operating season, and where relevant the surface rights, power, water, mining personnel and potential sites for tailings, waste, heap leach pads and a processing plant. Topographic maps, road and power line maps and climate records cover most of it.

Item 6 History requires the prior ownership and ownership changes, the type, amount and results of earlier owners' and operators' exploration and development, any historical estimates and any production. This information is in earlier operators' assessment reports, technical reports and company filings, and in government mineral occurrence databases (free data portals by country), and Canadian claim holders must file assessment reports to keep their claims (how mineral exploration works). A historical estimate needs its source and date, a comment on its relevance and reliability, and a statement with equal prominence that a QP hasn't done enough work to classify it as current mineral resources or mineral reserves (NI 43-101, section 2.4).

Item 7 Geological Setting and Mineralization requires the regional, local and property geology and the significant mineralized zones on the property, with the surrounding rock types, geological controls and the length, width, depth and continuity of the mineralization. Government geological survey maps give the regional and local geology, and earlier reports and the issuer's mapping describe the mineralized zones.

Item 8 Deposit Types requires the deposit type under investigation and the geological model or concepts for planning the exploration program, and published models such as the 85 descriptive deposit models in USGS Bulletin 1693 list each type's rock types, alteration, ore controls and geochemical signature.

Item 23 Adjacent Properties can include an adjacent property's information only if its owner or operator disclosed it publicly. The report must identify the source, state that the QP couldn't verify the information and that it isn't necessarily indicative of the mineralization on the property, and keep it separate from the property's own information.

Company and QP items

Item 9 Exploration and Item 10 Drilling describe the issuer's own work, and when they include earlier operators' results, the report must identify the issuer's work clearly. Item 11 Sample Preparation, Analyses and Security covers sample preparation, security, laboratories and QA/QC, with the author's opinion on their adequacy, and in Item 12 Data Verification the QP describes their own verification steps, any limits on them and whether the data is adequate for the report.

Items 13 and 14 cover metallurgical test work and the resource estimate, and Items 15 to 22 cover the reserve estimate, mining and recovery methods, infrastructure, markets and contracts, environmental studies and permitting, costs and the economic analysis. A report can have several QPs, and the issuer files each QP's dated, signed certificate naming the items they're responsible for, and each QP's signed consent to the filing (NI 43-101, sections 8.1 and 8.3).

The QP also writes Item 1 Summary, Item 2 Introduction, Item 3 Reliance on Other Experts, Item 24 Other Relevant Data and Information, Item 25 Interpretation and Conclusions and Item 26 Recommendations. Item 26 sets out at most two phases of recommended work, with a cost breakdown for each, and before the issuer files the report, at least one QP must complete a current personal inspection of the property, unless seasonal weather prevents access to an early-stage exploration property (section 6.2).

Software by item

Software Items Job in the report
GeoTheories 4 to 10 and 23 Cited first drafts from public records and your files, with S-K 1300 sections 3 to 7 and 20 and JORC Table 1 Section 2, for the QP to review and sign
acQuire GIM Suite, DataShed or MX Deposit 9, 10, 11 and 12 Drill hole, sample and assay data with validation and QA/QC
Leapfrog Geo and Leapfrog Edge 7 and 14 3D geological model and resource estimate
Micromine Origin 7 and 14 Geological model and grade estimate
Datamine Studio RM 14 Grade estimate, block model and classification
Maptek Vulcan 14, 15 and 16 Block model, estimate, mine design and schedule
QGIS, ArcGIS Pro or Seequent Target Illustrations Location, compilation and plan maps, and drill sections

A drill hole database holds the logs, samples and assays for Items 9 to 12. acQuire GIM Suite applies validation rules at capture and keeps the data auditable, DataShed loads assay and pXRF files automatically and validates data at entry with QA/QC protocols, and in MX Deposit you log drill hole and sample data online or offline and run ongoing QA/QC on assays. The issuer must keep the assay certificates, drill logs and other information the report references for 7 years (NI 43-101, section 6.3).

Leapfrog Geo builds implicit 3D geological models from drill holes, points and structural measurements, and Leapfrog Edge, an extension to Leapfrog Geo, estimates the resource by kriging, inverse distance or RBF, and you export its parameter report to Excel for the Item 14 discussion of assumptions, parameters and methods. Micromine Origin builds implicit and explicit models and runs multiple kriging and inverse distance weighting estimates, and Datamine Studio RM covers grade estimation, block modelling, classification and validation. For an advanced property, Maptek Vulcan adds open pit and underground design, pit optimization and scheduling for Items 15 and 16 (prices in exploration software by job).

Form 43-101F1 requires legible maps, plans and sections, and each map needs a date, a legend, the author or information source, a bar or grid scale and a north arrow, and every report needs a location or index map and a compilation map of the property's general geology. A report on an exploration project also needs maps of previous exploration, known mineralization, geochemical and geophysical anomalies, drilling and mineral deposits relative to the property boundaries, so you draw them in a GIS such as QGIS or ArcGIS Pro, or in Seequent Target for plan maps and sections (GIS options for geologists).

GeoTheories report drafts

The GeoTheories report builder drafts Items 4 to 10 and 23 from public records and your own files with every sentence cited and ready for QP review.

The Item 4 draft cites the mineral titles, owner, royalty or stream holder and earn-in partner for the property, and the Item 6 draft lists the earlier owners and every historic hole, intercept, end-of-hole depth and report on the property. The Item 7 and Item 8 drafts cite the government geological maps of the property and classify every occurrence by one deposit-type schema, with types such as porphyry copper or orogenic gold, and the Item 23 draft gives each adjacent property's published resource with the Item 23 cautionary statement.

Digitize PDF tables and scanned maps from your own reports into layers. Drafts export to Word with numbered citations, map and table figures and a linked reference list, and for a dual-listed company you switch the same drafts to S-K 1300 sections 3 to 7 and 20 or JORC Table 1 Section 2 (the JORC Code explained).

It drafts the same items for a property in any country or mining district, including Yukon, the Athabasca Basin, Greenland, Argentina, Sweden and South Australia. Solo is $299 a month or $2,499 a year, and Team is $699 a month or $5,849 a year for up to 5 people, through self-serve checkout.

Proposed new form

The Canadian Securities Administrators (CSA) proposed on June 12, 2025 to repeal and replace NI 43-101 and Form 43-101F1, and the comment period ended on October 10, 2025 (CSA notice). The proposed form keeps 27 items, but Item 23 is Current Personal Inspection, Item 7 requires a cautionary statement next to any discussion of a neighbouring or analogue project, and the QP must describe the data verification for each item. The BCSC gives no effective date for the proposed form (checked November 2026).

FAQ

What is an NI 43-101 technical report?

An NI 43-101 technical report summarizes all material scientific and technical information on a mineral property as of its effective date, and it follows Form 43-101F1 (NI 43-101, section 1.1). Issuers file it on SEDAR+ with each QP's certificate and consent.

How many items does a 43-101 report have?

Form 43-101F1 has 27 items. Every technical report uses the headings of Items 1 to 14 and 23 to 27, and a report on an advanced property also uses Items 15 to 22.

When does a company need an NI 43-101 technical report?

An issuer must file a technical report for each material property when it becomes a reporting issuer in Canada (section 4.1). It must also file one to support scientific or technical information in documents such as a preliminary prospectus, an annual information form or a first disclosure of mineral resources, mineral reserves or PEA results when it's a material change (section 4.2).

Who can sign an NI 43-101 technical report?

A qualified person (QP) signs it, and NI 43-101 defines a QP as an engineer or geoscientist with a university degree or equivalent accreditation, at least five years of relevant experience, experience relevant to the project and good standing with a professional association (section 1.1). One or more QPs prepare or supervise the report, and some reports, such as the report on becoming a reporting issuer, need QPs independent of the issuer (sections 5.1 and 5.3).

Can software draft NI 43-101 technical report sections?

Yes, GeoTheories drafts NI 43-101 Items 4 to 10 and 23, S-K 1300 sections 3 to 7 and 20 and JORC Table 1 Section 2 from public records and your files with every sentence cited and ready for QP review. Leapfrog Edge, Micromine Origin and Datamine Studio RM produce the resource estimate for Item 14, and the QP writes that item's discussion of assumptions, parameters and methods.

What's the difference between NI 43-101 and JORC?

NI 43-101 sets mineral project disclosure for issuers reporting in Canada, and a qualified person signs the technical report on Form 43-101F1. The JORC Code sets reporting for ASX and NZX listed companies, and a Competent Person gives written consent to each report (the JORC Code explained).