Mineral exploration is the search for a mineral deposit worth mining. It starts with a desktop study, then mapping and sampling, geophysics and drilling, and if the drill holes intersect enough mineralization, the company estimates a resource, completes a preliminary economic assessment (PEA), pre-feasibility and feasibility studies, and then permits and builds the mine. Each stage costs more than the one before, most projects end after early exploration, and Natural Resources Canada (NRCan) estimates fewer than 1 in 10,000 mineral showings (located mineral occurrences of unknown extent) become a mine.
Exploration stages
| Stage | Main work | Reporting terms |
|---|---|---|
| Desktop study | Compile maps, surveys, assessment reports and historic holes | Historical estimate (NI 43-101) |
| Mapping and sampling | Map rock types, sample rock and soil, dig trenches | Exploration information (NI 43-101), Exploration Results (JORC, S-K 1300) |
| Geophysics | Airborne and ground surveys | Exploration information (NI 43-101), Exploration Results (JORC, S-K 1300) |
| Drilling | Diamond core and RC holes, assays | Exploration information (NI 43-101), Exploration Results (JORC, S-K 1300), Exploration Target (JORC) |
| Resource estimate | Inferred, Indicated and Measured categories | Mineral Resource |
| PEA | First economic study | PEA (NI 43-101), Scoping Study (JORC), initial assessment (S-K 1300) |
| Pre-feasibility and feasibility | Mine plan, processing and costs | Mineral Reserve, or Ore Reserve under JORC |
| Permitting | Environmental assessment and permits | Item 20, Environmental Studies, Permitting and Social or Community Impact (NI 43-101) |
| Construction | Mine, mill and infrastructure | Development stage issuer (S-K 1300) |
Desktop study
In a desktop study the geologist reviews existing geological, geochemical and geophysical maps, surveys and reports, including earlier operators' assessment reports (NRCan). Canadian claim holders must file assessment reports on their work to keep their claims, and the public can read those reports through the provincial, territorial or federal mines office (historic drill holes and reports by country). Government surveys publish much of this data for free (free data portals by country), and geologists usually compile it in a GIS (QGIS vs ArcGIS, desktop study workflow). GeoTheories compiles the geology, geophysics, geochem, satellite alteration, mine records, drill holes, filings and claims for any ground, and agents walk your thesis through every layer.
Mapping and sampling
Prospectors and geologists map rock types and structure and collect rock and soil samples by hand for assay, and after a promising find they stake claims for the exclusive right to explore that ground for a set period (NRCan). Then the company digs trenches, long ditches to expose the geology under the soil, and cuts channel samples across the mineralized zones.
A claim holder keeps the ground by doing assessment work, and if a claim lapses, the mineral rights return to the Crown and anyone can re-stake the land (NRCan, claim lapses and transfers).
Geophysics
Many deposits lie under soil, glacial till or other overburden, so companies fly airborne geophysical surveys, cut a grid of lines and carry ground instruments along it, and then they drill-test the anomalies (NRCan). Geoscience Australia's survey methods include magnetics for magnetic minerals, gravity for rock density, airborne electromagnetics for conductive rock, radiometrics for potassium, uranium and thorium, magnetotellurics for subsurface resistivity and seismic for images of the crust at depth (Geoscience Australia, geophysical surveys compared). Induced polarization (IP), a ground method, detects disseminated sulphides, and geophysicists first developed it to explore for porphyry copper (USGS).
Drilling
A diamond drill's bit cuts a solid cylinder of rock (drill core) about 4 to 5 centimetres across, to depths of a kilometre or more, and NRCan's 2013 guide estimated the cost at several hundred dollars a metre and a season's program at over $100,000, or $1 million or more on a larger project (NRCan). A reverse circulation (RC) drill returns rock chips instead of core. Aircore and rotary air blast (RAB) drilling are cheap first-pass methods, and RC and diamond drilling cost more but give better samples, so explorers use them more at advanced stages (Novo Resources, core drilling, RC drilling).
Once you're drilling, you need a drill hole database and 3D modelling software (exploration software by stage). Before you plan holes, GeoTheories shows each historic hole on the property, with its intercepts and end-of-hole depth.
Resource estimate
A Mineral Resource is a concentration of material of economic interest with reasonable prospects for eventual economic extraction, and the qualified person (QP) classifies it as Inferred, Indicated or Measured, in order of increasing geological confidence (CIM Definition Standards). QPs estimate Inferred resources from limited geological evidence and sampling, the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) prohibits converting them to reserves, and CIM says continued exploration could upgrade most of them to Indicated. JORC and S-K 1300 use the same three categories (JORC Code explained).
PEA
A preliminary economic assessment (PEA) is any study other than a pre-feasibility or feasibility study with an economic analysis of the potential viability of mineral resources (NI 43-101). A PEA can include Inferred resources if the company states with equal prominence that they're too speculative geologically to become reserves and that there's no certainty the PEA will be realized. JORC calls this order-of-magnitude study a Scoping Study (JORC Code, clause 38), and under S-K 1300 a company needs a QP's initial assessment before it can disclose any resource (S-K 1300). None of the three can support a reserve.
Pre-feasibility and feasibility studies
A pre-feasibility study (PFS) assesses a range of options once the project has a preferred mining method or pit configuration and a processing method, and CIM requires at least a PFS to convert resources to Mineral Reserves (CIM Definition Standards). A feasibility study assesses the selected option in detail, and the company or a lender can base its decision to build or finance the mine on it. Both studies apply the modifying factors (mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors) to convert Indicated resources to Probable Mineral Reserves and Measured resources to Proven or Probable Mineral Reserves, and JORC names them Probable and Proved Ore Reserves.
Permitting and construction
Governments require an environmental assessment before they grant a mining licence, and the board makes the final investment decision once the company has finished the feasibility study, arranged financing and received the permits (NRCan). The board can still cancel or postpone the project at that point if commodity markets are uncertain, and construction takes most of the project's money. In Canada, NRCan estimates mine development at 7 to 10 years: two to three years of test work and studies, one to three years of environmental assessment and permitting, and two to four years of construction.
Costs and timelines
| Item | Cost or time | Source |
|---|---|---|
| Core drilling | C$271.12 a metre on average in Quebec in 2023, up 14.4% from 2022 | Institut de la statistique du Québec |
| Drilling base rates | $110 to $250 a metre for diamond, $30 to $55 for RC, $18 to $30 for aircore and $12 to $20 for RAB, and consumables, standby, mobilization and water cartage often bring the all-in cost to double the base rate | Novo Resources |
| Test work, studies and permitting | About $10 million, and up to $100 million with special test facilities on site, as at diamond mines | NRCan |
| Mine construction | Often $100 million or more, and $750 million and $1.3 billion in construction and start-up costs for the Ekati and Diavik diamond mines | NRCan |
| Promising showing to new mine | Usually at least 7 to 10 years | NRCan |
| Discovery to production, critical mineral mines | 29 years on average in the US, 27 in Canada and 34 in Zambia, across 268 mines (July 2024) | S&P Global |
Odds of discovery
NRCan estimates fewer than 1 in 10,000 mineral showings become a mine, and says most exploration projects don't advance from early exploration to the diamond drilling of intermediate exploration (NRCan). Different companies can explore a property many times without success, and its ownership can change many times during exploration.
Roles in exploration
Junior exploration companies carry out most exploration in Canada (NRCan).
| Player | Role in exploration |
|---|---|
| Prospectors | Search for mineral showings, guided by government maps and reports, and sell properties to companies |
| Junior exploration companies | Small, usually public companies with no mine and no revenue, raising money on the market to find deposits and then sell them or partner with a major |
| Project generators | Acquire early-stage ground and sell or option it to partners for option payments, a retained royalty and sometimes shares |
| Senior (major) mining companies | Explore to extend existing mines or develop new ones, funded from mine profits, and buy properties from prospectors and juniors |
| Royalty and streaming companies | Buy royalties and streams on future production (royalty and streaming companies) |
| Contractors | Drilling, geophysical survey, helicopter, laboratory, expediting, line cutting and environmental baseline services |
| Governments | Publish geological, geochemical and geophysical maps and reports, administer claims, issue work permits and offer tax incentives |
| Communities | Discuss jobs, business and baseline studies with the company, and give input through permitting boards |
EMX Royalty, a project generator, sold its Trench property in Nevada to Ridgeline Minerals for US$650,000 in option payments and a retained 3% net smelter return (NSR) royalty (EMX Royalty MD&A, 2025). Junior explorers accounted for about half of Canada's exploration and deposit appraisal spending in 2024 (NRCan bulletin).
Permits by stage
Approvals depend on the type of work and the jurisdiction (NRCan).
| Work | Approvals |
|---|---|
| Prospecting | A prospector's licence, and no permit for airborne surveys (NRCan, Canada) |
| Claims | Registration under the area's rules, by staking posts on the ground or selecting claims online, and assessment work to keep them (NRCan) |
| Ground work and drilling | In Canada, permits under the mining act scaled to the work, plus permits for tree cutting, camps and roads (NRCan). On US Bureau of Land Management (BLM) land, a notice 15 calendar days before exploration disturbing 5 acres or less, and a plan of operations above that (43 CFR 3809.21, 3809.11). In Western Australia, an approved Programme of Work before any mechanized ground disturbance (WA mines department, drill permits compared) |
| Advanced exploration and bulk samples | In Ontario, a mining lease, a closure plan with financial assurance and consultation before a shaft, a test mill or extraction above a prescribed quantity (Ontario). |
Environmental and community work
Early exploration usually leaves no significant long-term impact, and when a project stops, the company rehabilitates the site (NRCan). NRCan encourages companies to start environmental baseline studies of soil, vegetation, wildlife, water and cultural areas during intermediate exploration, and the company uses the baseline in the environmental assessment the law requires before a mine.
In Canada the duty to consult Indigenous peoples is the Crown's legal obligation, and the Crown may take a company's engagement into account (NRCan). Companies and communities may sign exploration agreements, memoranda of understanding or letters of intent at the exploration stage, and an impact and benefit agreement (IBA) at the mine development stage.
Deposit models
The USGS defines a mineral deposit model as the systematically arranged information on the essential attributes of a class of deposits, and USGS Bulletin 1693 presents 85 descriptive and 60 grade-tonnage models. The USGS wrote the model attributes as guides for planning exploration and interpreting its results. The descriptive model lists the host rocks, alteration, ore controls and geochemistry to look for, and the grade-tonnage model gives the size and grade of known deposits of the type.
| Deposit type | Host and ore controls | Exploration guides (USGS Bulletin 1693) |
|---|---|---|
| Porphyry copper | Stockwork veinlets in altered porphyry intrusions | Potassic core, then phyllic, argillic and propylitic alteration outward, with copper, molybdenum and gold in the centre |
| Copper skarn | Carbonate rocks next to tonalite to monzogranite intrusions | Calc-silicate minerals in stream pebbles as a guide to covered deposits, and magnetic anomalies |
| Epithermal gold-silver | Quartz-adularia veins in felsic to intermediate volcanic rocks | Bleached, clay-altered rock, and gold with arsenic, antimony and mercury |
| Carlin-type gold | Silty carbonaceous limestone and dolomite along faults and bedding | Jasperoid, and gold with arsenic, mercury and tungsten |
| Orogenic gold | Quartz veins along regional high-angle faults, best in greenstone belts | Quartz chips in soil, and arsenic as the best pathfinder |
| IOCG | Hematite-rich breccia in granite, as at Olympic Dam | A gravity high and a magnetic high |
| Placer | Alluvial gravel and conglomerate | The highest gold values at the base of the gravel, in natural riffles and fractured bedrock across the stream flow |
| Witwatersrand-type gold | Mature quartz-pebble conglomerate on unconformities | Gold at the base of conglomerate beds in braided stream channels, and anomalous radioactivity |
GeoTheories classifies every occurrence by deposit type, and you overlay host rock, structure, geophysics and open ground to find target areas for your deposit model.
Greenfield vs brownfield exploration
In mining, greenfield exploration is the search for a deposit to develop as a new mine with new infrastructure, in a remote area or an established mining field, and brownfield exploration is work close to an operating mine to extend its life using its existing infrastructure (Australian House of Representatives committee). NRCan counts exploration near closed mines as brownfield too, and calls it grassroots exploration when nobody has found the mineral in the area before.
Companies also re-explore old properties with new approaches and technologies (NRCan). Dakota Gold's resource for its Richmond Hill oxide heap leach gold project in South Dakota's Homestake district uses a historical database of 902 drill holes and 90,447 metres, plus 146 holes and 45,540 metres of its own drilling since 2022 (Dakota Gold, July 2025 news release). Under NI 43-101 a company can publish an earlier operator's estimate as a historical estimate, if it states with equal prominence that a QP hasn't done enough work to classify it as current mineral resources or reserves (NI 43-101, section 2.4).
GeoTheories lists the historic holes, intercepts and reports for any property before you stake, option or buy.
Exploration spending
Canada's exploration and deposit appraisal spending rose 4% to C$4.4 billion in 2025 (preliminary), and companies plan C$5.3 billion for 2026, up 21%, which would be a new high if realized (NRCan bulletin, April 2026). Precious metals, mainly gold, took 50% of 2025 spending, base metals 27% and uranium 10%.
Australian mineral exploration spending rose 3.9% to A$1,142.9 million in the June 2026 quarter (seasonally adjusted), up 17.9% on a year earlier (ABS, June 2026). Of the unadjusted A$1,189.8 million total, gold took A$565.6 million, and existing deposits took A$915.3 million (about 77%) against A$274.5 million for new deposits.
Financing
Juniors depend on the capital markets to pay for exploration, and in Canada they usually raise money on the TSX and TSX Venture Exchange (NRCan). They sell shares by prospectus or in private placements, sales of shares without a prospectus under an exemption, and most private placement shares have resale restrictions, so the buyer can't sell them for a set period (Manitoba Securities Commission). Canadian juniors also sell flow-through shares, where the company renounces its Canadian exploration expenses (CEE) to the investors and they deduct those expenses from their own income (CRA).
A royalty holder receives a share of a mine's production or revenue, and a net smelter return (NSR) royalty is a percentage of the value of production after the deductions the royalty contract defines (Franco-Nevada, gold royalty and streaming companies). A stream is a metal purchase agreement, and the holder makes an upfront payment and a further payment on each delivery of metal (Franco-Nevada).
In an earn-in, a partner earns an interest in a junior's project by funding its exploration, and the two form a joint venture once the partner has spent the agreed amount. BHP can earn 75% of Cobre's Kitlanya copper projects in Botswana by funding US$25 million of exploration within 8 years (Cobre half-year report).
GeoTheories shows who owns each project, who holds the royalty or stream and which earn-in partner is paying for the drilling.
Junior company pipelines
Check each project in a junior's pipeline for:
- The stage, from desktop study to resource estimate, and which projects the company treats as material, because NI 43-101 technical reports and the ASX's extra reporting rules apply to material properties (NI 43-101, section 4.2, ASX Guidance Note 31, section 2.2)
- The resource categories, because Inferred resources can't convert to reserves (CIM Definition Standards)
- Tenure security and any known impediment to a licence to operate (JORC Code, Table 1 section 2)
- The partners: who's earning in, who holds a royalty or stream, and the company's interest after the earn-in
- Cash against the planned work. An ASX exploration company reports its activities, its tenements and farm-in and farm-out interests and an Appendix 5B cash flow statement within a month of each quarter's end (ASX Guidance Note 31, section 3.1)
- Prior drilling and historical estimates on the ground, and whether the company has verified them (historic drill holes and reports, investor research tools)
In GeoTheories, you check each project in a junior's pipeline against the geology, historic holes, claims and royalty holders on that ground before you buy shares.
Public reporting
NI 43-101 is Canada's disclosure rule for mineral projects. A qualified person (QP), an engineer or geoscientist with at least five years of relevant experience and in good standing with a professional association, must prepare, supervise or approve every scientific or technical disclosure about a material property, and the company files a technical report in the 27-item Form 43-101F1 when it becomes a reporting issuer or first discloses resources, reserves or PEA results for that property (NI 43-101, Form 43-101F1 items).
The JORC Code is the reporting standard in Australia and New Zealand. A Competent Person prepares or directs and signs the documentation for every public report of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, JORC Code explained).
S-K 1300 is the SEC's mining disclosure rule for registrants with mining operations. A qualified person prepares the information, and the company files the QP's signed technical report summary as an exhibit when it first discloses resources or reserves on a property or when they change materially (17 CFR 229.1302).
The GeoTheories report builder drafts cited NI 43-101 Items 4 to 10 and 23 (property, access, history, geology, deposit types, exploration, drilling and adjacent properties), JORC Table 1 Section 2 and S-K 1300 sections 3 to 7 and 20 for the QP to sign.
GeoTheories
In GeoTheories, you build a thesis, such as porphyry copper under post-mineral cover in a known district, and agents walk it through every layer. You can test unlimited theses in any country or mining district, including Yukon, the Athabasca Basin, Greenland, Argentina, Sweden and South Australia.
Solo is $299 a month or $2,499 a year, and Team is $699 a month or $5,849 a year for up to 5 people, through self-serve checkout. With ground alerts, you get an email when a claim (or tenement) in your thesis area is staked, transferred, lapses or is 30 days from expiry.