Chuquicamata is CODELCO's copper mine 15 km north of Calama in Chile's Antofagasta Region, at 2,870 m above sea level, and after 104 years of open pit mining CODELCO began block caving it in 2019 (CODELCO annual report, 2025, CODELCO annual report, 2019). It's a porphyry copper deposit in the Eocene–Oligocene Chuqui Porphyry Complex, and Ossandón and others call it the world's greatest copper orebody (Economic Geology, 2001). The West Fault system controlled the deposit from the first intrusions, probably at 36–33 Ma, through mineralization, with the last major hydrothermal event at 31 Ma, to post-mineral brecciation and offset (Economic Geology, 2001). The Chuquicamata Division produced 265.8 kt of copper in 2025, and it reports reserves of 1,238 Mt at 0.63% total copper containing 7.8 Mt of copper (CODELCO annual report, 2025).
Chuqui Porphyry Complex
The East, West, Banco and Fine Texture porphyries make up the Chuqui Porphyry Complex, and the coarse, hypidiomorphic-granular East porphyry is the dominant host rock (Economic Geology, 2001). CODELCO geologists measure the complex at about 14 by 1.5 km, and they give ages of 34.6 Ma for the East porphyry, 33.4 Ma for the West and Banco porphyries and 39–38 Ma for the barren Fortuna Intrusive Complex (Faunes and others, 2005). Early ductile deformation, then pervasive cataclastic deformation and faulting affect all the porphyries, and they make the intrusive contacts between most of them very hard to recognize (Economic Geology, 2001).
Potassic alteration affects every porphyry, with partial K-feldspar and albite replacement of plagioclase and more widespread biotite replacement of hornblende, and it largely preserves the igneous texture (Economic Geology, 2001). Background potassic alteration carries 0.1 to 0.5% Cu as weak chalcopyrite, pyrite and mostly disseminated bornite, and an intense potassic event added bornite, digenite, chalcopyrite and covellite at 0.6 to 1.2% Cu (Faunes and others, 2005). Ossandón and others map a band of quartz-K feldspar alteration up to 200 m wide and 1,500 m long along the southward extension of the Banco porphyry dykes, and the band is the locus of the deposit's bornite-digenite centre (Economic Geology, 2001).
Massive quartz-molybdenite veins form a tabular, subvertical, north-south to north-northeast core zone grading 0.1 to 0.2% Mo (Faunes and others, 2005). A late quartz-sericite phase in a north-south zone in the western part of the deposit added no more than about 0.3 to 0.5% Cu as a telescoped high-sulphidation assemblage, with abundant pyrite and variable digenite, covellite, enargite, chalcopyrite and bornite (Faunes and others, 2005). Sillitoe and Perelló describe this telescoping of structurally localized high-sulphidation assemblages over earlier, deeper alteration as typical of the middle Eocene to early Oligocene deposits of northern Chile (Economic Geology 100th Anniversary Volume, 2005). McInnes and others found rapid cooling of about 100 °C per million years after emplacement at about 35 Ma, so the copper mineralization formed less than 4 km deep (Economic Geology, 1999).
West Fault
The West Fault, also called the West Fissure, is a district-scale branch of the regional Domeyko Fault System, and its post-mineral displacement splits the Chuquicamata deposit and juxtaposes the mineralized Chuqui Porphyry on the east against the barren Fortuna Complex on the west (Faunes and others, 2005). In Faunes and others' account, the fault also strongly controlled where the ore-hosting porphyries intruded (Faunes and others, 2005).
Post-mineral movement on the fault displaced part of the orebody (Economic Geology, 1999). McInnes and others used apatite (U-Th)/He ages from the Fortuna and Chuquicamata blocks to estimate at least 600 ± 100 m of vertical displacement, and they concluded that the missing portion of the orebody should lie at a present elevation of at least 3,600 m (Economic Geology, 1999). Tomlinson and others disputed that interpretation, and they cited structural data for about 35 to 37 km of left-lateral and 500 to 600 m of down-on-the-west displacement (Economic Geology, 2001).
Campbell and others found matching zircon U-Pb ages in the Los Picos-Fortuna and Pajonal-El Abra complexes, now 35 km apart on opposite sides of the fault, and the correlation constrains the fault's net sinistral displacement since about 33 Ma (Economic Geology, 2006). They also date the ore-bearing intrusions at Chuquicamata 3.5 million years younger than the youngest Los Picos-Fortuna-Pajonal-El Abra intrusions, so a genetic link between them is unlikely (Economic Geology, 2006).
Supergene enrichment
At least two leaching, oxidation and enrichment events affected Chuquicamata between 19 and 15 Ma, and the first formed a thick, strongly enriched blanket averaging 2 to 3% Cu (Faunes and others, 2005). Later uplift left hematitic leached remnants in the quartz-sericite rocks and high-grade copper sulphates in near-surface potassic rocks, and in 2005 CODELCO geologists reported low-grade remnants of the oxide cap in the northern part of the pit (Faunes and others, 2005). Sillitoe and McKee's K-Ar ages on supergene alunite across northern Chile range from about 34 to 14 Ma, and supergene activity throughout northern Chile ended at about 14 Ma (Economic Geology, 1996).
Acid drainage carried copper south from Chuquicamata through a paleochannel toward the Calama Basin and formed the Mina Sur (Exótica) exotic deposit, and CODELCO geologists estimated 2.5 Mt of copper at Mina Sur (Faunes and others, 2005, Mineralium Deposita, 2022). In Dold and others' model, the main chrysocolla and copper pitch and wad ore formed where the Fortuna gravels, from about 19 Ma, intercepted the acid drainage, more chrysocolla formed after hyperaridity at about 15 to 11 Ma exposed the chalcocite blanket to oxidation, and chloride-rich groundwater, most likely between 6 and 3 Ma, formed the atacamite and brochantite (Mineralium Deposita, 2022).
History
Pre-Hispanic cultures knew the Chuquicamata deposit, and by the late 19th century small miners worked its oxidized outcrops and high-grade oxide veins (Memoria Chilena, Faunes and others, 2005). Guggenheim interests bought the claims, formed the Chile Exploration Company in New Jersey in January 1912 and began large-scale open pit mining on 18 May 1915 (Memoria Chilena, CODELCO annual report, 2025). The Guggenheims sold Chuquicamata to Anaconda in the 1920s, and output averaged about 100,000 t of copper a year in that decade (CODELCO, Memoria Chilena).
Chile's 1966 Chileanization law, Law 16,425, created mixed companies in which the state would hold 51% of the large copper mines, and in 1969 the state bought 51% of Anaconda's subsidiary, the Chile Exploration Company (CODELCO annual report, 2025, CODELCO). In July 1971 Congress unanimously passed Law 17,450, and the foreign companies' assets at Chuquicamata, Exótica, Salvador, Andina and El Teniente became state property (CODELCO annual report, 2025). Decree Laws 1,349 and 1,350 of 1976 split the state copper corporation into COCHILCO, the technical advisory agency, and CODELCO, the producing company, and Chuquicamata has belonged to CODELCO since 1 April 1976 (CODELCO annual report, 2025, CODELCO).
Chuquicamata Underground
CODELCO describes the pit as about 5 km long, 3 km wide and 1 km deep, and in 2005 its geologists reported mining about 170,000 t of ore and 400,000 t of waste a day (CODELCO, Faunes and others, 2005). CODELCO took the first underground ore from the first macroblock in April 2019, and in August 2019 it inaugurated Chuquicamata Underground (Chuquicamata Subterránea) at a cost of US$5.5 billion including early works (CODELCO, April 2019, CODELCO annual report, 2019).
CODELCO block caves macroblocks of about 35,000 m², 16 to 20 per production level, on three levels reaching more than 898 m below the pit floor and more than 2 km below surface (CODELCO, August 2019). CODELCO's 2019 plan set a seven-year ramp-up to 140,000 t of ore a day by 2026, for more than 320,000 t of copper and 16,000 t of molybdenum a year from 1,028 Mt of reserves at 0.82% Cu and at least four more decades of mining (CODELCO annual report, 2019).
In 2025 ore shipments from the underground mine to the plant reached 57,000 t a day, and CODELCO plans to reach 140,000 t/d in the next decade with the continuation of Level 1 (CODELCO annual report, 2025). Its Phase 1 continuity project on Level 1, for the north and south macroblocks of line 4, adds infrastructure and ventilation capacity, and it was 90% complete at the end of 2025, with its first crushing chamber finished in October (CODELCO annual report, 2025). CODELCO continues engineering studies for the remaining reserves of Levels 1 and 2 (CODELCO annual report, 2025).
CODELCO's 2025 report lists an open pit as well as the underground mine at the Chuquicamata Division, and the division's own ore feed to the plant fell to 90,000 t/d in 2025 from 110,000 t/d in 2024, especially from the pit, after a change in operating strategy (CODELCO annual report, 2025).
Production and reserves
| Year | Chuquicamata Division copper, kt |
|---|---|
| 2023 | 248 |
| 2024 | 289 |
| 2025 | 266 |
CODELCO attributes the 2025 decrease to lower own-ore feed, lower recoveries and operating problems at the filter plant, and Chuquicamata's 265.8 kt made up about 20% of CODELCO's own production of 1,334 kt (CODELCO annual report, 2025). The Chuquicamata concentrator also treats Radomiro Tomic sulphide ore, 77,000 t/d in 2025, up from 59,000 t/d in 2024 (CODELCO annual report, 2025).
| Chuquicamata Division, 2025 | Mt | Total Cu % | Contained Cu, Mt |
|---|---|---|---|
| Proved reserve | 821 | 0.76 | 6.2 |
| Probable reserve | 416 | 0.37 | 1.6 |
| Total reserve | 1,238 | 0.63 | 7.8 |
| Measured resource | 1,035 | 0.77 | 8.0 |
| Indicated resource | 589 | 0.62 | 3.7 |
| Inferred resource | 1,247 | 0.46 | 5.7 |
| Total mineral resource | 2,871 | 0.61 | 17.4 |
| Geological resource | 14,299 | 0.42 | 60.6 |
CODELCO counts as mineral resources the geological resources with reasonable prospects for eventual economic extraction, and its mineral resources include its reserves (CODELCO annual report, 2025). Each division publishes a resource and reserve report every year, and competent persons with current certificates from Chile's Comisión Calificadora de Competencias en Recursos y Reservas Mineras sign them (CODELCO annual report, 2025). In 2005 CODELCO geologists estimated about 67 Mt of in situ copper at Chuquicamata, 2.5 Mt at Mina Sur and about 25 Mt of potential at Radomiro Tomic, within a district anomaly of about 125 Mt of copper (Faunes and others, 2005).
Chilean copper belt
Sillitoe and Perelló call the middle Eocene to early Oligocene belt the premier copper belt of the Andes, and it accounted for about 65% of Andean discoveries in the three decades before 2005 (Economic Geology 100th Anniversary Volume, 2005). In northern Chile its porphyry deposits coincide with major orogen-parallel fault systems with synmineral reverse displacement, and uplift during contraction ultimately caused the supergene upgrading of many deposits there (Economic Geology 100th Anniversary Volume, 2005). The ore-bearing porphyries of the Chuquicamata-El Abra belt, at Chuquicamata, El Abra, Radomiro Tomic and Opache, span 37.9 to 33.3 Ma (Economic Geology, 2006).
CODELCO mines Radomiro Tomic 25 km north of Calama and Ministro Hales 10 km north of Calama, and it owns 49% of El Abra and Freeport-McMoRan owns 51% (CODELCO annual report, 2025). USGS estimates Chile's 2025 mine production at 5.3 Mt of copper, about 23% of the world's 23 Mt, and its reserves at 180 Mt of the world's 980 Mt (USGS, 2026).
CODELCO's geologists judged that the district's remaining potential lay under cover, so in 1998 they started a district exploration program to change what Rivera and Pardo call the West Fissure paradigm (SEG Special Publication 11, 2005). They drilled reverse-circulation scout holes on a 1 km grid, then closer-spaced holes, and found Genoveva at the end of 1999 and Toki at the end of 2000, 15 km southwest of the mine (SEG Special Publication 11, 2005). Toki lies under 120 to 200 m of Miocene gravel and lacustrine sediment (SEG Special Publication 11, 2005). In 2005 Rivera and Pardo reported more than 2,400 Mt of inferred resources at Toki at about 0.5% Cu, and a third of it was oxide and mixed oxide-sulphide mineralization (SEG Special Publication 11, 2005). Toki's mineralization at about 37 Ma predates the Chuquicamata complex (35 to 31 Ma), so the district had several discrete pulses of intrusion and mineralization (SEG Special Publication 11, 2005). Sillitoe and Perelló report that more than half of central Andean discoveries in the 13 years before 2005 were under pre- or post-mineral cover (Economic Geology 100th Anniversary Volume, 2005).
East of the Eocene–Oligocene belt, the Miocene to early Pliocene belt lies along the eastern border of the orogen, and in the central Andes the copper belts extend from southern Peru to central Chile and contiguous Argentina (Economic Geology 100th Anniversary Volume, 2005).
Questions
Who owns Chuquicamata?
CODELCO, Chile's state copper company, owns and operates it, and Chuquicamata has been 100% Chilean since the July 1971 nationalization (CODELCO annual report, 2025, CODELCO).
Is Chuquicamata still an open pit?
Yes, CODELCO still mines the open pit, and it has block caved under the pit since 2019 (its 2025 report lists both at the Chuquicamata Division) (CODELCO annual report, 2025).
How deep is the Chuquicamata mine?
CODELCO describes the open pit as about 1 km deep, and the underground mine's three levels reach more than 898 m below the pit floor and more than 2 km below surface (CODELCO, CODELCO, August 2019).
How much copper does Chuquicamata produce?
The Chuquicamata Division produced 265.8 kt of copper in 2025, down from 289.0 kt in 2024, and CODELCO's 2019 plan for the underground mine set more than 320 kt a year at full rate (CODELCO annual report, 2025, CODELCO annual report, 2019).
When did mining start at Chuquicamata?
Large-scale mining began on 18 May 1915 under the Chile Exploration Company, and small miners had worked the oxidized outcrops in the late 19th century (CODELCO annual report, 2025, Faunes and others, 2005).
GeoTheories for northern Chile ground
In GeoTheories, agents build out your thesis from the deposit model and then walk it through every layer. Within 50 km of Chuquicamata, GeoTheories maps 35,976 drill log and assay intervals from SERNAGEOMIN's SIGEX filings plus occurrences and mining concessions. For a thesis on an Eocene–Oligocene porphyry under Miocene gravel along the Domeyko Fault System, such as another Toki-style centre in the Chuquicamata district, agents check it against the intrusive rock units, the magnetics, the historic holes and their end-of-hole depths and the open concessions, so you see which covered ground earlier operators drilled and to what depth.
Each project page shows the owner, royalty or stream holder and earn-in partner, and GeoTheories types every occurrence to one deposit-type schema, with models including porphyry copper. You digitize scanned sections, level plans and PDF assay tables into layers, and you get cited first drafts of NI 43-101 Items 4 to 10 and 23, S-K 1300 sections 3 to 7 and 20 and JORC Table 1 Section 2 for the QP to sign. With ground alerts you get an email when a concession in your thesis area is applied for, transferred, lapses or is 30 days from expiry.
Solo is $299 a month or $2,499 a year, and Team is $699 a month or $5,849 a year for up to 5 people, through self-serve checkout.