Research/Method

Core drilling in mineral exploration

How diamond drilling works, core sizes, other drill types, cost per metre, permits and QA/QC, and how to read intercepts and true widths in a release.

Updated November 202613 min read

Core drilling (diamond drilling) cuts a solid cylinder of rock, the drill core, with a diamond-impregnated bit on rotating hollow rods, and a wireline winch pulls the core to surface in an inner tube while the rods stay in the hole (Geological Survey of Western Australia, GSWA). Standard wireline core ranges from 36.4 mm across in BQ to 85.0 mm in PQ (Boart Longyear), and geologists log the core for rock type, alteration, mineralization and structure before the company sends half, quarter or whole core from each sample interval to the lab (CIM, JORC Code). In a drill release, investors read each result as a downhole interval and a grade, such as 14.5 m at 4.15 g/t gold, and check the true width, the higher-grade intervals inside it and the collar table, because NI 43-101 section 3.3 and JORC Table 1 ask for each of them.

Diamond drilling

The bit is ring-shaped and impregnated with fine industrial diamonds in a metal matrix, so as the rods turn it grinds an annular cut (the kerf) and leaves a solid core, and the inner tube slides down over the core (GSWA). The driller pumps water down the rods and out through holes in the bit to cool and lubricate it and flush the cuttings out of the hole, and a split-ring core lifter lets the core into the tube but stops it sliding back out.

At the end of each run, the driller lowers an overshot (a latching tool on the winch cable) down inside the rods, latches it onto the inner tube and winches the tube and core to surface, then sends the empty tube back down to latch in place again (GSWA).

Companies drill targets they define from mapping, sampling and geophysics (how mineral exploration works). A company can drill the upper part of a hole as an RC precollar and the rest as a diamond tail (GSWA), and JORC Table 1 asks for the depth of each diamond tail (JORC Code).

Drill types

Method How it drills Sample Use it for
Diamond core Ring-shaped diamond bit cuts solid core, and the core comes up in an inner tube Solid core Structure, resource and metallurgical holes, to a kilometre or more
RC Hammer, with chips blown up the inner tube of dual-wall rods Chips, usually 1 m samples Resource definition and grade control in hard rock, routinely to 500 m
Aircore Three-blade bit, with chips blown up the inner tube Chips, occasionally small pieces of core First-pass holes through unconsolidated and weathered ground
RAB Blade bit or hammer on single-tube rods, with cuttings blown up outside the rods Chips, prone to downhole contamination Cheap, shallow first-pass holes
Rotary hammer (percussion) Down-the-hole or top-hole hammer, with cuttings blown up outside the rods Chips Hard rock
Vacuum Tungsten carbide blade bit, with a vacuum pump lifting the cuttings Uncontaminated cuttings Soft ground, mostly holes under 10 m
Auger A helical screw lifts the soil up the hole Soil and soft weathered rock Geochemistry reconnaissance in soft ground
Sonic Resonant vibration at 50 to 180 Hz fluidizes the ground at the bit Continuous, relatively undisturbed core Coring below waste dumps for grade control, and drilling heap leach pads

The methods and samples come from the GSWA drilling vocabulary, the stage of use and RAB contamination from Novo Resources, core depth from NRCan and the sonic uses from Boart Longyear.

Core sizes

Boart Longyear's 2025 catalogue lists the standard Q wireline sizes.

Size Core diameter Bit outer diameter
BQ 36.4 mm 59.8 mm
NQ 47.6 mm 75.6 mm
NQ2 (thin kerf) 50.7 mm 75.6 mm
NQ3 (triple tube) 45.1 mm 75.6 mm
HQ 63.5 mm 95.9 mm
HQ3 (triple tube) 61.1 mm 95.9 mm
PQ 85.0 mm 122.4 mm
PQ3 (triple tube) 83.1 mm 122.4 mm

A metre of PQ core has about 3.2 times the volume of a metre of NQ core (85.0 mm against 47.6 mm across), and Natural Resources Canada lists hole diameter among the factors in the cost per metre (NRCan). The exploration guidelines from CIM (the Canadian Institute of Mining, Metallurgy and Petroleum) ask for a hole diameter with enough representative material for logging, geotechnical testing, assays and stored reference (CIM), and JORC asks whether the sample size suits the grain size of the material and names coarse gold as a case with inherent sampling problems (JORC Code).

A triple-tube barrel adds a split inner liner, and Boart Longyear sells it for complete core recovery in clay-bearing and highly fractured rock (Boart Longyear). An NQ2 bit cuts 50.7 mm core in the same hole size as NQ, and Boart Longyear says thin-kerf (narrower-cut) systems can penetrate faster.

Core recovery

Core recovery is the length of core recovered as a percentage of the length drilled in each run (TxDOT). JORC asks how the company recorded and assessed recovery, what it did to maximize it, and whether a relationship between recovery and grade, or a preferential loss of fine or coarse material, biased the samples (JORC Code). In Canada, every written disclosure of drill results on a material property has to state any drilling, sampling or recovery factors with a possible material effect on the accuracy or reliability of the data (NI 43-101, section 3.3).

So a low-recovery run through a mineralized zone can bias the grade, and you should read the recovery note in the release before you compare intercepts between holes. Ramelius Resources, for example, jigsaws all its diamond core (fits the broken pieces back together) to account for any core loss (Ramelius, May 2024).

Orientation and downhole surveys

Core orientation determines the original position of the core in the ground, and with the downhole survey it gives the location and orientation of each piece before the driller extracted it (Imdex). A digital tool such as Imdex's ACTx records the orientation downhole, and at surface the driller marks the orientation line on the core with the tool's jig.

Geologists then measure the angle of each vein, fault and bedding plane to the core axis (the alpha angle), and CIM says oriented core gives a better spatial description of structures in structurally controlled deposits (CIM), such as orogenic gold deposits. JORC asks whether the orientation of sampling achieves unbiased sampling of possible structures, and whether the angle between the holes and the mineralized structures introduced a sampling bias (JORC Code).

Holes deviate from their planned azimuth and dip, so CIM recommends deviation surveys at regular intervals downhole, with tools suited to the hole size, angle and length and to how magnetic the host rocks are (CIM).

Logging and sampling

CIM's guidelines ask qualified and competent staff to log lithology, alteration, mineralization, the type and amount of potentially economic minerals, structure, hyperspectral data and geotechnical data, and to photograph the core before splitting (CIM).

The logging geologist marks the sample intervals in the core boxes, at a fixed length or along geological contacts such as the margins of a vein. CIM says individual samples generally shouldn't cross different rock types or styles of mineralization, and it asks for a continuous series of samples through the mineralized interval with unmineralized samples on each side (CIM).

A core saw cuts each interval lengthwise. Ramelius cuts its surface core along the orientation line, sends half to the lab and keeps the other half for reference, sends whole core from underground holes to get a bigger sample, and assays quarter core as field duplicates (Ramelius, May 2024).

QA/QC

CIM's guidelines ask for blanks (barren material, to catch contamination), certified reference materials (standards of known grade, to check accuracy) and duplicates (to check precision) in every drilling campaign, inserted often enough for statistical confidence and across the full range of grades, plus regular check assays at a third-party lab (CIM). Ramelius takes a quarter-core field duplicate and inserts a high- or low-grade standard or a blank every 20th sample, and it checks every standard and blank against its tolerance (Ramelius, May 2024).

JORC Table 1 asks whether independent or alternative company staff verified the significant intersections and whether the company drilled twinned holes (JORC Code). A twin is a new hole drilled beside an earlier one to check its grades, and CIM lists twinning and resampling old core as data verification for historic drilling (CIM).

Core storage

CIM asks the company to keep a representative fraction of the drill material, to think about future metallurgical, geotechnical and environmental tests when it sets retention rules, and to fix weatherproof metal tags inside and outside each core box (CIM). It also asks for secure logging, sampling and storage facilities, a recorded chain of custody and direct shipping to the lab.

Drill results

A release reports each intercept as a downhole interval and an average grade, such as 14.5 m at 4.15 g/t gold from 87.7 m in Dakota Gold's hole RH25C-288 at Richmond Hill, South Dakota (Dakota Gold, November 2025).

Item What to check
Interval From and to depths along the hole, and the cut-off grade and internal dilution used to calculate it
True width Downhole length or true width, and the angle between the hole and the zone
Gram-metres Grade times downhole length (g/t × m) to compare intercepts of different lengths
Including Short high-grade intervals inside the longer interval
Collar table Collar coordinates, elevation, azimuth, dip and end-of-hole depth
Recovery and QA/QC Core recovery, half, quarter or whole core, and standards, blanks and duplicates

The interval is a length along the hole. NI 43-101 requires the true width of the mineralized zone where it's known (NI 43-101, section 3.3), JORC asks for a clear statement such as "down hole length, true width not known" where it isn't (JORC Code), and Dakota Gold's footnote reads "True thickness unknown". For a planar zone, the true width is the downhole length times the sine of the alpha angle (between the zone and the core axis), so a zone at 60° to the core axis has a true width about 87% of the interval, and at 30° it's half.

Investors multiply grade by length (gram-metres, for gold) to compare intercepts of different lengths. Dakota Gold prints a gram-metre column and highlights 7 gram-metres and above because one 12.2 m mining bench at its 0.566 g/t average mine-plan grade is about 7 gram-metres, and it calculates its intervals on a 0.5 g/t gold cut-off with up to 3.05 m of dilution (Dakota Gold). JORC asks the company to state its cut-off grades, top cuts (caps on high assays) and averaging method, because they're usually material (JORC Code).

Dakota Gold reports 12.5 m at 3.76 g/t including 1.6 m at 23.20 g/t in hole RH25C-256, so the 1.6 m accounts for about 37 of the interval's 47 gram-metres and the other 10.9 m average about 0.9 g/t.

JORC Table 1 asks for a table of every material hole with the easting, northing and elevation (RL) of the collar, the dip and azimuth, the downhole length and depth of each intercept, and the hole length (JORC Code). The hole length (end-of-hole depth) is the length drilled along the hole, and an interval ending at the end-of-hole depth means the company stopped drilling in mineralization.

Hole spacing

Companies drill holes closer together at each stage, because the JORC Code's Inferred, Indicated and Measured resource categories need enough drilling to imply, assume and then confirm geological and grade continuity between holes (JORC Code).

Ramelius plans step-out holes (extending a zone) and infill holes (between existing holes) on nominal 20 to 40 m centres, its dominant spacing beneath the Eridanus pit design is about 40 m by 25 m, and its grade control drilling is 7.5 m by 7.5 m (Ramelius, May 2024).

Permits and rig access

Drill rigs come skid-, track- or truck-mounted, or modular for helicopter support on ground with no roads (Boart Longyear). Which permit you need depends on the rig and the area of ground it disturbs.

Jurisdiction Permit for drilling Threshold and timing
US federal (BLM) land Notice or plan of operations under 43 CFR 3809 Casual use excludes truck-mounted drills, a notice is due 15 calendar days before exploration disturbing 5 acres or less, and above 5 acres you need a plan of operations
British Columbia Mines Act permit through a Notice of Work Mechanized drilling needs a permit, hand-held drilling can be exempt, and decision targets are 40, 90 or 140 days by tier
Ontario Exploration plan or exploration permit A plan for a drill under 150 kg and a permit for a heavier drill
Western Australia Programme of Work (PoW) Any mechanized ground disturbance, with a target of 80% of assessments in 15 business days

Sources: 43 CFR 3809.5, 43 CFR 3809.21 and the BLM, the BC exploration permits page, Ontario's 2023 consultation guide and a 2026 exploration permit, and Western Australia's mines department.

Cost per metre

Put the method, core size, depth, rig mounting and downhole survey and orientation tools in the tender, because cost per metre rises with depth and core diameter (Novo Resources).

Core drilling for exploration and deposit appraisal in Quebec averaged C$271.12 a metre in 2023, up 14.4% from C$236.99 in 2022, on 1,515,771 m drilled (Institut de la statistique du Québec). Regional averages were C$204.40 a metre in Abitibi-Témiscamingue, C$295.46 in Nord-du-Québec and C$477.40 on the Côte-Nord (7,607 m of drilling).

Novo Resources' drilling glossary puts the base rate for RC at about a quarter of diamond drilling's, aircore at about an eighth and RAB at about a tenth, and says consumables, slow penetration, standby, mobilization and water cartage often bring the all-in cost to double the base rate (Novo Resources). So compare quotes on the all-in cost per metre.

GeoTheories for prior drilling

Each GeoTheories project page shows the historic holes, intercepts and end-of-hole depths for any property, so you see where earlier operators drilled and how deep before you plan holes. In GeoTheories, you check a company's new intercepts against the historic holes on the same ground before you buy shares.

You digitize old drill logs and assay tables from PDFs into layers, and GeoTheories standardizes every operator's rock names to one lithology schema. Agents build out your thesis from the deposit model and then walk it through every layer, in any country, and you get a cited first draft of NI 43-101 Item 10 (drilling) for the QP (qualified person) to sign.

Solo is $299 a month or $2,499 a year, and Team is $699 a month or $5,849 a year for up to 5 people, through self-serve checkout.

FAQ

What is diamond drilling?

Diamond drilling is core drilling with a diamond-impregnated bit, and it cuts a solid cylinder of rock (GSWA) for geologists to log for rock type, alteration and structure and for the lab to assay (CIM).

What are BQ, NQ, HQ and PQ core sizes?

They're wireline core sizes, with core diameters of 36.4 mm (BQ), 47.6 mm (NQ), 63.5 mm (HQ) and 85.0 mm (PQ) in Boart Longyear's catalogue. NQ3, HQ3 and PQ3 are triple-tube versions with slightly narrower core.

How deep can a diamond drill go?

A diamond drill cuts through rock to a kilometre or more (NRCan), and Boart Longyear says its deep surface coring rigs routinely drill deeper than 10,000 feet (3,048 metres) (Boart Longyear).

How much does diamond drilling cost per metre?

Core drilling for exploration and deposit appraisal in Quebec averaged C$271.12 a metre in 2023, from C$204.40 in Abitibi-Témiscamingue to C$477.40 on the Côte-Nord (Institut de la statistique du Québec). Extras such as consumables, standby and mobilization often bring the all-in cost to double the base rate (Novo Resources).

Do you need a permit to drill on a mining claim?

Yes, a mechanized drill needs a filing or permit on BLM land and in BC, Ontario and Western Australia. On BLM land a truck-mounted drill needs at least a notice (43 CFR 3809.5), BC needs a Mines Act permit, Ontario needs an exploration plan or permit depending on whether the drill weighs more than 150 kg, and Western Australia needs a Programme of Work.

What happens to drill core after drilling?

The geologist logs and photographs it, the company sends half, quarter or whole core from each sample interval to the lab (JORC Code), and it stores the remaining core in tagged core boxes (CIM). CIM asks the company to keep a representative fraction of the drill material and to document the reason whenever it discards any, and in some jurisdictions the mining statute sets whether the company keeps, disposes of or destroys core. Historic drill holes and assessment reports lists report systems and drill hole databases by jurisdiction, including the core libraries in Nevada and Sweden.

What does "true width not known" mean?

It means the company reports downhole lengths and doesn't know the geometry of the mineralized zone relative to the hole (JORC Code), so the true width is less than the interval unless the hole is perpendicular to the zone.

What's the difference between core drilling and RC drilling?

Core drilling cuts solid core with a water-cooled diamond bit, and RC drilling breaks the rock with a hammer and blows the chips up the inner tube of dual-wall rods with compressed air (GSWA). RC costs less per metre, core gives the most representative sample (Novo Resources), and core is the sample geologists orient for structural measurements (Imdex).